Showing posts with label driveway access. Show all posts
Showing posts with label driveway access. Show all posts

Friday, December 26, 2014

crisp christmas weather

Winter solstice, and the weather is beautiful.  Cold and crisp but warm enough to work in a T shirt in the sunshine, especially if there is something energetic to be getting on with.

It’s been raining loads, so the ground is rather wet to work unnecessarily, so I have been tempted to start clearing part of the ruin where my new house is going to be.  It’s the first time I’ve done any work on this area, as my priority has been the productive garden areas of the plot until now.  

I decided early on that it would be best to get a lot of long term planting done as soon as possible so that whilst building work is continuing, all the trees and shrubs can get on with growing.  Once the house is complete they will already be a decent size and hopefully the orchard will start to be productive.  All my fruit trees are happily settling in, along with thirty or so evergreen shrubs that I purchased to replace or bulk up the hedge to the windward side of the property.  The sooner there is a decent windbreak there the better.  I still have hedges to plant, but am waiting to clarify the boundaries with the neighbouring farmer before I go ahead and order the plants as I don’t want to get them in the wrong place.  Hopefully they’ll go in this season, if not next year will have to do.


newly planted fruit trees 

new raised beds (under construction)

the new drive, complete with planting, in the winter sun

no point clearing all the brambles!!!

they should grow well with this view I would have thought


So I started clearing the ruin, the safer part where the walls have already fallen.  The brambles went in a couple of hours but the next stage is going to take somewhat longer.  It’s fine, as I can’t get on with much else, there isn’t a rush to start building as the final permissions will be another three or four months in the processing and it’s great to have the opportunity to salvage as much as possible.

There are loads of whole roof tiles which I’ll add to the earlier collection.  Plenty of broken ones too which will make excellent sub base around the site when the time comes.  Hefty, solid timbers, ideal for garden structures or raised bed construction, more rotten bits for experimental projects (check out Hugelcultur, a method of vegetable cultivation that mounds soil over rotten timbers, the rotting wood releases nutrients, retains moisture and yet allows for a free draining soil.  With free materials on site, I thought I might make a couple of beds to see how it works).  Then there are all the unknown bits and pieces underneath the rubble.  Who knows what may be lurking below and by taking a bit of time, I’ll be more likely to find things in tact than if a bulldozer gets anywhere near the site.  Going on a treasure hunt.

It’s great to be working now, during the shortest days, to see how the light works its way round the plot and where the sunny and shaded areas are.  The sun is at it’s lowest in the sky and, whilst it’s strength is weak, it is of the most benefit for passively heating the inside of buildings during the cold winter months.  I checked this out and am very pleased to see that my kitchen and bathroom windows get sunshine all afternoon and till just after five in the evening, almost to sunset, maximising the effect of those warming rays.  The house won’t roast in summer because the windows become shaded by a balcony when the sun is higher in the sky.  If that isn’t enough, some climbing plants will soon be planted to give a little extra shade.




this bit of old wall is where my new kitchen window will be, it's 15:55 on 21/12/14  sunny till the end
exploring in the remains of a barn

Percy in the evening light with new 'keep clean' walkway to the chalet



just a little clearing to do


I’ll post some sketches and plans of the house right soon, so that you can all have a good look, ask questions, make suggestions and generally give it a good going over to see that it all makes sense.  I’ve been living imaginarily inside it for some time, yet still find details that don’t work and improvements that can be easily added at this stage of the proceedings.  Hopefully my next post, I just need to get some paperwork from on site.



it's caught on here too!!



to you all




So, that’s it for now.  A slightly belated Christmas to you all, I write on Boxing Day (Dec 26th) and with the sun shining am heading right back out there to carry on.  Best wishes and much love.  xxxxx

Friday, November 21, 2014

photographic evidence

wholesome lunchtime salad, followed by bread and cheese and a good cup of tea 
washing up facilities have improved

earthworks by the drive are now settling nicely

the mustard and broad beans that I sowed have germinated well and the roots will bind
the soil together nicely before the winter sets in

starting to leaf mulch the vegetable patch to keep it snug for the winter.  the worms will
work most of those leaves into the ground and it'll be easier to work next year.

progress with the extended vegetable area.  three beds now dug and mulched
paths covered with cardboard to keep the weeds down till I can sow clover next spring

the piles of reclaimed items continues to grow

Monday, October 13, 2014

new driveway

beautifully green, but steep and virtually inaccessible

not to be attempted in less than a 4x4


Earlier in the summer I got some quotes to improve the drive access to my property is it was rather steep and at an angle too tight to negotiate from one direction for even the nimblist of cars, I doubt even a London cab could have taken the turn.  Quote chosen, it was then suggested that I arrange for someone from the water company to come and mark where the mains pipes go so that they don’t get damaged during the excavations.  We’re talking 20 - 30 cubic metres of soil movement here.  That was easy, an engineer was on site by the time I’d returned from the offices via the market and he took several hours to be sure that he was marking the right place.  The pipes in question come straight from the reservoir on the hill and supply three or four neighbouring villages.  I would not have been popular if there had been any disruption to supply.  Thankfully the pipes are well out of the way and I asked that the company come to do the work.

They had suggested two days of work with digger, tractor and trailer, a couple of lorry loads of stone chippings and all would be done.  But when would they come to do it?  

By chance, on the Tuesday afternoon, hours after I had returned from two weeks away, they popped by to look at the pipe markings.  Happy with what they saw, we agreed that work would proceed on Thursday and Friday of that week and they went away.

All of a sudden I to decide what I could do in preparation as I knew they would just rip everything out with the bulldozer and I would be left with a couple of hundred metres of bare clayey soil.  All the plants, trees and shrubs would end up in a big pile with the disguarded earth and it would take ages for it to settle afterwards.  Much better to get rid or save as much all I could and leave them with a clear area to work with.

My other tasks went by the by as I hurriedly sawed down trees, by hand, that might serve as firewood, haul away old decaying branches and timber for compost, soil improvement and insect hotels.  I dug out crates of wild plants, wild strawberries, lungwort, ferns, geraniums, iris, violets, dead nettle and thirty or so smallish hedging plants and tucked them away in the shade for later.  I worked till dark that Tuesday and again all the next day, dismantling my newly erected letter box and getting everything as sorted as I could before the carnage began.

Sure enough at 07:15 on Thursday morning, just at first light, the digger arrived and I managed to squeeze Percy out before it was too late.  He spent two nights next door out of the way as the digger worked it’s magic and the tractor and trailer carted load after load of soil to the other side of the property.  Thankfully I had somewhere easy for it to be tipped and I made the most use of the earth moving opportunities with the big machinery on site.  Two loads of topsoil await spreading by the chalet to level off the ground and make it more usable in the long term.  A large mound, of topsoil again, to supplement raised beds in the veggie area and two large loads of the cleanest, crumbliest, clay we could get, put to one side in readiness for my wall renders.  There’s nothing like making the most of an opportunity, it can sit there, under it’s tarp for the next year or so and be ready to mix when it comes to constructing the house walls.  The rest of the spoil, tree stumps and all have gone over the bank at the back, roughly leveled with the giant machine then shoveled and raked by my own fair hand in readiness for sowing with seed.  I’m not sure how it’ll work as there’s little top soil to be seen, though I sprinkled on a good quantity of grass and clover seed to see what happens, then as an after thought, just to get it green again, a couple of packets of radish.  If they do well I’ll have plenty till the weather turns and then possibly even enough seed for resowing next year.  Too late really, I know, but it’s rather worth a chance.



In a day the heavy work was done.  It took several discussions and a bit of insistence to get almost exactly what I wanted, which wasn’t bad in my book after hearing some of the stories people tell.  I think it’ll stand me in good stead, to have used a french company, as the two guys know everyone in the neighbourhood and one of them is in charge of the team that looks after the road that goes passed the end of my drive.  

I was right, there were several hundred square metres of bare earth, much on a steep slope, with rain clouds threatening in the distance.  The guys stopped for the day and went home, gravel on order for delivery after lunch the following day.  I swung into action, with the aim of stabilizing the steepest of the slope before it was washed into the road by the threatening rain.  I hauled old beams and lintels from the other side of the garden, crafted pegs out of broken pallet pieces and set too creating a series of mini terraces.  By nightfall the most precipitous slope was secured at the most basic level.  The overnight rain was light and there were no major landslides so following morning I continued hauling timbers from about the site and pegging them to the slope until, by lunchtime, it started to resemble a grandstand at a sports field.  The first stage of stabilizing done.  





work in progress

an easier slope and a gentler corner 
the end of day one

that's going to wash away if it rains, for sure